The residential container house is made of steel and sandwich panel, which is very solid, energy-saving, environmental protection, pollution-free, is a kind of low-carbon environmental protection products. The residents' container house is a product. All the equipment and decoration have been completed in the interior and exterior. It is very convenient to install, move and disassemble. After the product leaves the factory, it can be used only by connecting the power supply and lifting with a crane. However, due to the imperfection of the current quality management system and potential performance problems, the residential container housing market is facing great challenges. We also more and more residential container manufacturers pay attention to standardized production, improve product safety performance, and emphasize brand effect.
In order to survive and stand in an invincible position in the harsh competitive environment, it is necessary to establish brand awareness, strengthen industry standardized management, and pay attention to the original design, setting and after-sales service of container housing. Due to the wide application of container housing in China in recent years, it has gradually become the "Star" industry in China's temporary construction industry. The huge market space brings hope to many enterprises looking for investment opportunities.
How to deal with the waterproof of container house? Jinan resident container manufacturers to introduce one of these processes, laying a soft waterproof layer, coating and coil can be selected. Roof waterproof construction conditions require that the moisture content of the ground is below 9%, so it is suitable for construction in summer after hot weather and sunny days. After completion, water storage experiment must be carried out.
2、 For waterproof coating, take "one cloth and two coatings" as an example. After cleaning the base course, apply the coating once. After drying and forming the film, lay the glass cloth shell reinforcement material, coat the flat surface with one coat of paint for fixation, and then carry out the next roof waterproof construction after drying.
3、 After cleaning the base course, apply the adhesive on the back of the coiled material and the base course, paste it in a long distance with an elastic datum line, press and hold it with a roller, and conduct the joint drawing inspection after * *.
4、 The second waterproof layer of roof waterproof project of resident container manufacturer: rigid waterproof layer shall be laid, and the construction shall be carried out about two days after the completion of the flexible waterproof layer. It mainly uses high-grade fatty acid mortar waterproof agent, cement, sand, fine aggregate and fiber as basic materials, and the thickness of waterproof layer is 20-30mm.
1. According to the requirements of the specification, install the lattice wooden rod, set the lattice as a fixed size. 2. From far to near, from high to low, the prepared mortar or fine aggregate concrete shall be graded one by one, and the same grading shall be completed at one time, and the reinforcement shall be smooth.
3、初凝后,取出格子木棒,按光調整格子間隙。
3. After initial setting, take out the lattice wooden stick and adjust the lattice gap according to the light.
4. Domestic container manufacturers use soft sealing materials to fill the lattice gap and treat the surface entrance. Construction standards and regulations of waterproof concrete. The preparation of ordinary waterproof concrete construction cement must meet the national standard, and must meet the following requirements: 1) good water resistance, small bleeding, low water heat, with certain corrosion resistance; 2) selection of waterproof concrete.
In the process of using the movable container room, regular inspection and maintenance are related to its service life and the personal safety of the users. This work should not be neglected and must be carried out, and the maintenance operation for any purpose can not be reduced.
1、集裝箱可動房間安裝完畢后,用戶不得隨意變更結構,不得拆卸螺栓部件,不得增加或減少隔壁。
1. After the installation of the movable container room, the user is not allowed to change the structure, dismantle the bolt parts, or add or reduce the partition wall.
2. All movable container rooms connected with screws shall be equipped with common power sockets and other facilities inside. The lighting source shall not be installed or hung on the steel frame. Square plastic wire pipes and conduits shall be insulated to prevent electric leakage and electric shock.
3、用戶配置電氣照明設備,分開安裝電線管和配線槽,以免電線直接束縛在鋼架結構上,防止觸電。
3. Users are equipped with electrical lighting equipment, and the wiring duct and distribution slot are separately installed to avoid the wire directly bound to the steel frame structure and prevent electric shock.
4、集裝箱可動房制作安裝完成后,除專家外不得隨4. After the completion of the fabrication and installation of the movable container room, it is not allowed to